PROJECT 3-NORWALK/WESTPORT
Representative Project Experience
The projects shown represent selected experience of YS Engineers’ key personnel obtained while employed by previous organizations. YS Engineers did not serve as the prime consultant or contractor on these projects unless specifically noted. This experience demonstrates the technical qualifications, leadership roles, and field expertise available to YS Engineers clients.”
I-95 Median Reconstruction and Resurfacing
Owner/Agency: Connecticut Department of Transportation
Location: Norwalk and Westport, Connecticut
Role: Construction Inspection Services
Project Duration: 2022 – 2024
Project Overview
This interstate highway project included reconstruction of the center median barrier system, shoulder widening, mainline and ramp resurfacing, interchange improvements, and rehabilitation of multiple bridge structures along approximately 2.5 miles of I-95. The project also included accelerated bridge construction utilizing lateral slide installation methods.
Responsibilities
- Performed construction inspection of highway and bridge work
- Verified compliance with traffic staging and safety requirements
- Coordinated accelerated bridge installation operations
- Monitored quality assurance testing and material placement
Scope of Work
- Interstate paving and resurfacing
- Median barrier construction
- Bridge rehabilitation
- Traffic control and staging
- Highway lighting upgrades
Results and Performance
- Maintained interstate traffic operations throughout construction
- Supported accelerated bridge construction scheduling
- Ensured compliance with CTDOT quality standards