DERBY-SHELTON
- Home
- /
- Project
Intersection Improvement – Stamford, CT
Improving Traffic Flow, Accessibility & Urban Infrastructure
Location
Route 106 at Route 1
and Hamilton Avenue,
Stamford, CT
Construction Value
Over $4 Million
Client
Connecticut Department
of Transportation
(CTDOT)
PROJECT OVERVIEW
Revitalizing A Historic Transportation Corridor
Creating Safer And More Efficient Transportation Connections
The Intersection Improvement project in Stamford was developed to reduce traffic congestion and optimize movement along Route 106 through targeted upgrades at Route 1 and Hamilton Avenue.
The improvements focused on enhancing roadway efficiency, improving pedestrian accessibility, and strengthening supporting infrastructure to meet long-term transportation demands.
Traffic Optimization
Reduced Congestion
Pedestrian Access
Safer Walkways
Infrastructure
Drainage Upgrades
Modernization
Long-Term Improvements
AT A GLANCE
SCOPE OF WORK
TRAFFIC FLOW & INTERSECTION UPGRADES
- Addition of dedicated turn lanes
- Improved intersection performance
- Better traffic circulation
- Enhanced safety for motorists and pedestrians
DRAINAGE & INFRASTRUCTURE IMPROVEMENTS
- Storm drainage system upgrades
- Improved water management
- Flood prevention enhancements
- Underground utility improvements
SIDEWALK & PEDESTRIAN ENHANCEMENTS
- Installation of ADA-compliant sidewalks
- Improved pedestrian connectivity
- Safer intersection crossings
- Enhanced public accessibility
PROJECT IMPACT
Supporting Safer And Smarter Transportation This project significantly improved traffic operations throughout Route 106 while reducing congestion and increasing roadway safety. With better pedestrian access and upgraded infrastructure, the improvements support Stamford’s ongoing transportation modernization efforts and provide long-term benefits for both motorists and pedestrians..
PROJECT GALLERY